textile Calculator

Garment Costing Calculator (CM & FOB)

Build a complete factory Cost Sheet: Fabric, Trims, CM (Cost of Making), Wash, and FOB price.

Audited by UniqCalc Methodology Team • Formula Checked • Free & No Registration Required

Verified Mathematical Model & Formulation

FOB Price = Fabric Cost + Trims & Packaging + CM (Cut & Make) + Wash/Print + Commercial Overhead + Profit

Generates the standard export garment costing breakdown used by global apparel manufacturers to quote Free On Board (FOB) prices to international retail brands.

Configurable Parameters & Standard Units

  • Fabric Cost ($): (Default: 3 usd)
  • Trims & Accessories ($): (Default: 0.75 usd)
  • Cost of Making (CM Labor) ($): (Default: 1.8 usd)
  • Printing, Wash & Embroidery ($): (Default: 0.45 usd)
  • Factory Profit Margin (%): (Default: 10 percent)

Standard Worked Example & Practical Verification

Scenario: Woven cotton twill fabric $3.80, trims/zipper $0.90, CM labor $2.20, enzyme wash $0.60, 10% profit margin.

Calculated Solution
$8.45 FOB Export Price per Piece

Practical Takeaway: Fabric accounts for 45% of total cost, CM labor accounts for 26%.

Frequently Asked Questions

What does CM vs CMT mean in garment manufacturing?

CM stands for "Cut and Make" (labor and machine operating cost only). CMT stands for "Cut, Make, and Trim" (labor plus all thread, labels, and packaging trims).